Reconstruction and construction of facilities for the production of dialysis sets / II. Phase
2009—2011
Construction of new production and storage hall operationally connected to the existing assembly hall M1C, including the construction of transport and technical infrastructure. Editing and expanding the gallery of the existing M1C. Extension of the existing administrative building on the 4th floor. A total of 680 m² of cleanroom space was built in the ISO 8 purity class according to ISO 14644–1.