ABB s.r.o.

Reconstruction of ABB s.r.o.


2011—2012

Study elaboration, design documentation at basic and detailed design levels and engineering activities including planning permission and building permit.

Complete construction, including cleanrooms. Cleanrooms in purity class ISO 6 to ISO 8 (according to ISO 14644–1) with a total area of 1,500 m².


zavřít